allowance
[Back]


A specific sum of money set aside in a construction contract to accomplish something that has not been specified exactly yet.

Practice Known Questions

Stay up to date with your due questions

Complete 5 questions to enable practice

Exams

Exam: Test your skills

Test your skills in exam mode

Learn New Questions

Popular in this course

Learn with flashcards

Dynamic Modes

SmartIntelligent mix of all modes
CustomUse settings to weight dynamic modes

Manual Mode [BETA]

The course owner has not enabled manual mode
Other available modes

multiple choiceMultiple choice mode
SpeakingAnswer with voice
TypingTyping only mode

CMGT 110-01 - Leaderboard

1 user has completed this course

No users have played this course yet, be the first


CMGT 110-01 - Details

Levels:

Questions:

86 questions
🇬🇧🇬🇧
Allowance
A specific sum of money set aside in a construction contract to accomplish something that has not been specified exactly yet.
The plan view
The top view of a form
The elevation view
The front or side view of a form
The perspective view
Represents what our eye sees
The isometric view
3D with no perspective
Dashed lines in a projected drawing of a 3D form indicate
Edges that are hidden behind other surfaces
SketchUp produces _ models. (3)
Solid, edge, and surface
In SketchUp layers are used to _. (3)
Organize model content, view model content, lock model content
In SketchUp 'entity information' is used to _.
View information about the model content
In SketchUp the 'Scenes' are used to _. (3)
View specific model content, edit specific model content, create a 'movie'
An admixture is a substance added to (4)
A concrete mix, delay the setting of a mix, change the color of a mix, alter the behavior of the mix
The purpose of a footing or foundation is to _. (3)
Transfer the building load into the earth, spread the building load out over a larger area, keep the building from settling
The centering of an arch or vault is _.
The framework for the structure
The substructure of a building is _.
The structure below the ground
The North elevation of a building _.
Faces North (from the inside)
The purpose of an acoustical ceiling is to _. (4)
Show an exposed grid, be suspended from the structure above, reduce sound reflection in a space, lower the ceiling in the space
The term 'existing grade' refers to _. (3)
The level of the soil before any construction takes place, the final levl of the soil around a project, the existing landscaping
An easement is _.
A legal restriction on a piece of property
A section view
A vertical plane cut through an object
A dead load consists of the weight of _ in a building.
The construction & permanently installed materials/equipment
Bridging is _.
Cross bracing between joists
If a material is impervious, it
Doesn't allow objects to pass through
Our classroom has a(n) _ ceiling.
Acoustical exposed grid
The plan view
The top view of a form
The elevation view
The front or side view of a form
A perspective view
Looks much like our eyes see it
The plan view
The top view
The section view may consist of (3)
A plan view, a horizontal cut through the form, a vertical cut through the form
A subfloor is the _.
The base for the finish floor